Planningvia Greater London Council Planning
Details of a Air Quality and Dust Management Plan (AQDMP) including an Air Quality (Dust) Risk Assessment pursuant to...
Good news for our local community as plans are underway for a new church and community centre! We've got the details on the Air Quality and Dust Management Plan being put in place to ensure the redevelopment of the existing church site is handled with care for our neighbourhood.
Details of a Air Quality and Dust Management Plan (AQDMP) including an Air Quality (Dust) Risk Assessment pursuant to Condition 16 of planning permission ref: 235010FUL dated 27.02.2026 for: Redevelopment of the site to provide a two storey building with part basement area to facilitate a church, community centre (Mixed Use Class F1(f)/F2(b)) and ancillary accommodation (following the demolition of the existing church Condition 3: A2232A-Staffordshire-Slate-Blue-Smooth-Technical-Data-Sheet Crest Charleston Blues Brick Info Card e Condition 14: 1. Construction Phase Health and Safety Plan v1_7.25 2. FWC - Site_set_up_&_traffic_Management_RAMS_SBC430_v1_3.26 3. Site Set Up plan Condition 16: 1. Air Quality and Dust Management Plan 2. Site Set Up plan - Appendix A - Monitoring Locations Plan - Appendix B - Daily Dust Inspection Sheet - Appendix C - Complaints Log Template - Appendix D - NRMM Inventory Sheet - Appendix E - Training / Toolbox Talk Materials Condition 18 and 19: Geo-Site Assessment Letter Report - FWC- Issue A Condition 22: JF539-JFL-ZZ-XX-RP-J-0003_TM52 Overheating Reports JF539-JFL-ZZ-XX-RP-J-0004_TM59 Overheating Reports
š Freedom Worship Centre Western Road Southall UB2 5EA
š Ref: 261304CND
š Type: Discharge Condition
š Status: Pending Consideration
šļø Ward: Southall Green
ā° Consultation ends: 2026-04-09

Comments
No comments yet. Be the first to share your thoughts!